envelope Sign up to receive email updates when new content is posted.

Mountain Region

Arrowhead Pine Rose

Notice of Availability

Initial Study

Traffic Study

Noise Study

Habitat Assessment - Update

Site Plan

Parking Layout

Soundproofing Walls


 

Arrowhead Villas Water Reservoirs 
Air Quality and Greenhouse Gas Modeling


 

Church of the Woods Project (Rim Forest) 
Final EIR 
Appendix E1
Appendix F1
Appendix I


James Kennedy Highest & Best Use LLC

 

Notice of Availability

Initial Study

Hydrology Study

General Biological Resource Assessment

Cultural Resources Assessment

Air Quality Evaluation


Lazer Broadcasting, Inc. (Oak Glen)

 

Notice of Availability (November 23, 2020)

Recirculated Environmental Impact Report (November 23, 2020)

Recirculated EIR Comment Letters

Responses to Comments on Recirculated EIR

Initial Study

Visual Impact Assessment

Revised Notice of Availability/Notice of Intent

Environmental Impact Report

2016 Notice of Availability

Engineering Statement

Notice of Preparation

Fire Protection Analysis

SBSC Ruling

Visual Assessment Forms

Biology Reports

Geotechnical Investigation

NOP Comment Letters

Visual Resource Assessments

Previous Posted Documents: 

Final Environmental Impact Report (FEIR)

Initial Study (October 26, 2011)

Visual Impact Assessment

Revised Notice of Availability/Notice of Intent

Environmental Impact Report (May 2016)

2016 Notice of Availability

Engineering Statement

Notice of Preparation

Fire Protection Analysis

SBSC Ruling

Visual Assessment Forms

Biology Reports

Geotechnical Investigation

NOP Comment Letters

Visual Resource Assessments


Maple Hill Community Fields Complex

Notice of Availability/Notice of intent

Initial Study

Appendix 1: Arborist Report

Appendix 2: Air Quality Report

Appendix 3: Biology

Appendix 5: Hydrology

Appendix 6: Traffic Letter

Figures


 

Moon Camp 2020

Final Environmental Impact Report

Mitigation Monitoring Reporting Program

Appendix A: 2005 FEIR, 2010 RRDEIR No. 1 and 2011 RRDEIR No. 2

Appendix B: Shute, Mihaly & Weinberger LLP Letter Exhibits

Appendix C: Sierra Club Letter Exhibit

Appendix D: Friends of Fawnskin (2) Letter Exhibits

Appendix E: Jurisdictional Determination Update Memo

Appendix F: Thomas Harder Groundwater Consulting Letter

Appendix G: Proof of Water Service

G.1—LAFCO Water Service Approval - G.2—Bear Lake Department of Water—Service Letter

Appendix H: CalEEMod Modeling

 H.1—Memorandum - H.2—Data

Appendix I: ELMNT Biological Database Technical Review

Appendix J: Habitat Assessment

Appendix K: 2016 Ashy-grey Indian Paintbrush Survey Update

Appendix L: 2018 Focused Traffic Impact Assessment Response to Comments

Appendix M: Revised 2018 Focused Traffic Impact Assessment

Appendix N: Revised Tentative Tract Map

Appendix O: Cultural Resources Study

Draft Long-Term Management Plan


North Shore Pipeline 

 

Notice of Determination

Notice of Availability

Initial Study

Proposed Improvements

Geo-Technical Report

Cultural Resources Report

Biological Report

Air Quality and Greenhouse Gas Analysis.


Pine Tree RV Park

 

Notice of Availability

Initial Study

Preliminary Hydrology Study

Left Turn Warrant Study

Grading Plans

Biological Report

NOD


Stone Oak Manor

Notice of Availability/Notice of Intent

Initial Study

Stone Oak Manor B&B Burrowing Owl Survey

Non-Confidential Summary Cultural Records Search

Preliminary Drainage Study

Oak Glen Noise Impact Study

Preliminary-WQMP

Traffic-Trip Gen Report


ARCHIVES

Mountain Archive (Close)


AT&T Wireless

Initial Study


Big Bear Closure Cover Soil Project

Notice of Availability (February 11, 2010)

Initial Study


Burtner, William and Lisa

Initial Study


DeVincenzi

Initial Study

NOA/NOI


KADTEC - Adam Phillips

Initial Study

Mitigated Negative Declaration

Letter Recap of Acoustical Analyses

Notice of Availability/Notice of Intent


Mobilitie (Bear Valley)

Notice of Availability and Initial Study


Metro PCS Project (Lake Arrowhead)

Initial Study

Notice of Availability


Omya - White Knob - White Ridge Quarries Expansion Project

 Please CLICK HERE to access the supporting environmental documents

Notice of Preparation and Initial Study

Amended Mine and Reclamation Plan


Verizon Wireless

Notice of Availability

Initial Study

Biological Study

Cultural Assessment

Geology Report


YMCA of Long Beach

Initial Study

Notice of Availability / Notice of Intent




Arrowhead Villas Water Reservoir 

Notice of Availability 

Initial Study

Biology Report

Cultural Report

Drainage Study

Geotechnical Report


Burtner Day Care 

Notice of Availability 

Initial Study

Air Quality Report

Biotic Resources Report Update

Biological Report

Cultural Report

Cultural Report with testing

Geologic Investigation Report

Drainage Study

Water Quality Management Plan


Route 66 - Shooting Range

Notice of Availability

Initial Study

Trip Generation Report

Biotic Resources Report

Geologic Hazards Report

Notice of Availability


Pine Rose Cabins

Notice of Availability

Mitigated Negative Declaration

Traffic Study

Traffic Comments/Response

Habitat Assessment

Noise Study

Sound Suppression


Christopher Cook(High Trails Outdoor Science School)

Notice of Availability

Initial Study

Arborist Assessment June 2017

Forest Assessment

Biological Resources Assessment December 2016

Biological Resources CEQA Cumulative Analysis August 2017

Mountain Yellow Legged Frog and Southern Rubber Boa May 2017

San Bernardino Flying Squirrel May 2017

Southwestern Willow Flycatcher Habitat Assessment June 2017

Paleontological Resources Assessment

Soils Investigation

Cultural Report August 2017

Cultural Report October 2017

Cultural Resource Constraints  


Church of the Woods Project (Rim Forest)

Final EIR 2020 Final EIR 

2019 Documents:

Notice of Availability 

Draft Revised EIR

Air Quality and GHG Analysis

Habitat Assessment

Geotechnical Update Report

Earthwork Analysis Report

Evacuation Plan

Fuel Modification Plan

Drainage Study

Noise Study

Traffic Study

 

Previous Documents:

Church of the Woods EIR Tables 3C-1 and 3C-2 with Legend

Extension of Time for Draft EIR (May 28, 2010)

Notice of Availability (April 16, 2010)

Draft EIR Volume I

Draft EIR Volume II

Draft EIR Volume III

Notice of Preparation (February 10, 2005)

Initial Study

Final EIR

Notice of Completion


Lazor Broadcasting, Inc.(Oak Glen)

 

Final Environmental Impact Report (FEIR)

Initial Study (October 26, 2011)

Visual Impact Assessment

Revised Notice of Availability/Notice of Intent

Environmental Impact Report (May 2016)

2016 Notice of Availability

Engineering Statement

Notice of Preparation

Fire Protection Analysis

SBSC Ruling

Visual Assessment Forms

Biology Reports

Geotechnical Investigation

NOP Comment Letters

Visual Resource Assessments


Mitsubishi Cement Corporation

001 Updated Notice Of Availability

002 Cover Discrimination Statement

003 Table Of Contents

004 Summary

Chapter 1 Purpose And Need

Chapter 2 Description Of Proposed Action And Alternatives

Chapter 3.10 Recreation

Chapter 3.11 Scenery

Chapter 3.1 Introduction

Chapter 3.2 Air Quality

Chapter 3.3 Biological Resources

Chapter 3.4 Cultural Heritage Resources

Chapter 3.5 Geology Soils Minerals

Chapter 3.6 Greenhouse Gases

Chapter 3.7 Hazards And Hazardous Materials

Chapter 3.8 Hydrology And Water Quality

Chapter 3.9 Noise

Chapter 4 Other Required Section

Chapter 5 Consultation-Coordination

Chapter 6 Acronyms-References

Chapter 7 Index

Appendix A-1 - Scoping Report

Appendix A-2 - Initial Study

Appendix B- Air Quality Report

Appendix C - Ba-Be And Raptor Conservation Strategy

Appendix D - Jurisdictional Delineation Report

Appendix E Cushenbury Springs Hydrogeologic Evaluation

Appendix F - Geology-Soils-Hydro-Wq

Appendix G - Hazardous Materials Technical Report

Appendix H - Water Supply Assessment

Appendix I - Noise Report

Appendix J - Recreation Analysis

Appendix K - Scenery Report

Moon Camp 2018

Final EIR

Appendices:

Title Page

Table of Contents

Appendix A

Appendix B

Appendix C

Appendix D

Appendix E

Appendix F

Appendix G

Appendix H

Appendix I

Appendix J

Appendix K

Appendix L

Appendix M

Previous Documents:

Extension of Time for Recirculated DEIR II

Notice of Availability (December 9, 2011)

Recirculated DEIR II

Appendix A

Appendix B

Appendix O

Moon Camp 50 - Lot Residential Subdivision TT No. 16136 EIR (Fawnskin)

Notice of Availability (April 2, 2010)

Draft Revised and Re-circulated Environmental Impact Report (March 25, 2010)

Appendices

Moon Camp Residential Subdivision TT No. 16136 EIR (Fawnskin)

Notice of Availability (March 29, 2004)

Notice of Completion (January 27, 2006)

Draft Environmental Impact Report (March 29, 2004)

Draft Environmental Impact Report - Biological Section (March 2, 2005)

Final Environmental Impact Report (January 27, 2006)


Munem Maida

NOI Extension of Comment Period

Notice of Availability/ Intent 2014

Revised Initial Study 2014

Air Quality Impact Report 2014

Biological Report Revised 2014

Biological Letter 2014

Supplemental Preliminary Hydrology Analysis 2014

Traffic Study Updated 6-27-14

Traffic Study Updated 6-27-14- Exhibit A

Traffic Study Updated 6-27-14- Appendix

Winter Weekend Traffic Analysis 1-15-14

Response to Caltrans letter 6-23-14

Biological Report 2013

Preliminary Hydrology Drainage Study 2013

Preliminary Water Quality Management Plan Redlines 2013


Selenium Wireless Facility

Notice of Availability

Mitigated Negative Declaration

Initial Study

Photo Simulations

Selenium Cultural Report

Geotechnical Report


Skypark

Sky Park Revised Final EIR

Sky Park Revised Final EIR Appendices

Final EIR

Draft EIR

Notice of Preparation

APPENDIX A Notice Of Preparation and Comment Letters

APPENDIX B California Cooperative Forest Management Plan

APPENDIX C Air Quality- GHG Emissions Data

APPENDIX D.1 Habitat Assessment

APPENDIX D.2 Jurisdictional Delineation

APPENDIX D.3 NRCS Conservation Plan

APPENDIX F Engineers Septic System Memo

APPENDIX G Hydrogeologic Evaluation Technical Memo

APPENDIX H Noise Modeling Data

APPENDIX I Traffic Study