envelope Sign up to receive email updates when new content is posted.

Valley Region

JM Realty Group, Inc. (Slover Distribution Center)   

Final EIR-Uploaded on 6-15-18

Notice of Availability of DEIR

Draft EIR

Appendix A Scoping Documents

Appendix B Air Quality, GHG, Energy

Appendix C Biological Resources

Appendix D Cultural Resources

Appendix E Geology

Appendix F Hazardous Materials

Appendix G Noise

Appendix H Traffic

Appendix I Water Resources


800 Opal, LLC

Initial Study (UPDATED-February 15, 2018)

Traffic Impact Study

Biological Study

Burrowing Owl Survey Study

Drainage Study

Cultural Resources Study

Air Quality Impact Report

Fiscal Impact Analysis

Greenhouse Gas Report

Health Risk Analysis Report

Noise Impact Analysis

Geotechnical Report

WQMP

NOA


Agua Mansa Distribution Center- Strategic Land Partners

Notice of Availabiltiy

Initial Study

Air Quality Assessment

Air Quality Assessment (Addendum)

Delineation of State and Federal Jurisdictional Waters

Drainage Report

Delhi Sands Flower-Loving Fly Habitat Suitability Assessment

Habitat Assessment

Noise Impact Study

Traffic Report

WQMP


Alabama Venture I, L.P.

Notice of Availability (November 16, 2014)

Initial Study

Air Quality, Global Climate Change, Health Risk Assessment

Noise Impact

Traffic Impact


Alere Warehouse @ Cajon Boulevard

Notice of Availability/Notice of Intent

Air Quality Impact Analysis

Biological Assessment

San Bernardino Kangaroo Rat Trapping Study

Geotechnical Report

Soil Infiltration Study

Energy Analysis

Greenhouse Gas Analysis

Historic Resources Assessment

Health Risk Assessment

Hydrology Calculations

Noise Impact Analysis

Phase I Prehistoric Resources Assessment

Phase I Environmental Site Assessment

Preliminary WQMP

Traffic Impact Analysis


Arrowhead Regional Medical Center Project (Colton)

Notice of Availability (December 3, 2008)

Initial Study


Auto Club Speedway Event Center Project (Fontana)

Final Subsequent Environmental Impact Report (September 2010)

Notice of Availability (September 10, 2010)


Auto Club Speedway Event Center Project (Fontana)

Draft Recirculated Subsequent Environmental Impact Report (March 2010)

Appendices A-H

Notice of Completion (March 23, 2010)

Notice of Preparation (August 22, 2008)

Initial Study


Auto Club Speedway Event Center Project (Fontana)

Notice of Completion (July, 2009) of a Draft Subsequent Environmental Impact Report for the Auto Club (Formerly California) Speedway Event Center.

Draft Subsequent Environmental Impact Report

Appendix A Initial Study

Appendix B Notice of Preparation

Appendix C Notice of Preparation Mailing Labels

Appendix D Notice of Preparation Comments

Appendix E1 Technical Noise Analysis

Appendix E2 Combined Noise Summaries

Appendix F Air Quality Study

Appendix G Response to Comments

Appendix H Figures from Original DSEIR


Avenal Financial - Tentative Tract 18822

Notice of Availability/Notice of Intent

Initial Study


Banuelos, Jose & Martha

Initial Study


Bloomington Affordable Housing Project

Notice of Availability/Notice of Intent

Initial Study/Environmental Assessment

Regional Map

Vicinity Map

Site Plan

Elevation

Paleo-Archeo Assessment

Habitat Assessment

Air Quality Data

Environmental Site Assessment Phase I

Asbestos Survey

Lead Survey

Noise Data

Traffic Impact Analysis


Bloomington Business Center

Notice of Preporation

Notice of Availability

MND-Initial Study


California Steel Industries, Inc.

Notice of Availability and Notice of Intent

Initial Study


Cedar Avenue Technology Center

Notice of Availability

Mitigated Negative Declaration - MND

Air Quality

Geotechnical

Greenhouse Gas Emissions

Habitat Evaluation

Historical Archaeological Resources

Noise Study

Phase I Environmental

Preliminary Drainage Study

Traffic

Water Quality Management Plan


Chino Airport Groundwater Remedial Project 

Initial Study 

Notice of Availability/Notice of Intent 

Biological Resources (Updated May 10, 2018)


Chino Valley Chinese SDA Church

Notice of Availability/Notice of Intent

Initial Study


Coastal Commercial Properties

Initial Study


Cornerstone Land Surveying Inc. TTM

Initial Study

Notice of Availability

Acoustical Study

Historical Resources Investigation

WQMP


CRP Oakmont Redwood Avenue, LLC

Initial Study

Notice of Availability

Traffic Impact Analysis

Noise Study

Air Quality and Climate Change Assessment

Phase I Environmental Site Assessment


DCT Industrial

Initial Study

Notice of Availability/Notice of Intent


Drive Time Car Lot Sales

Notice of Availability/Notice of Intent

Initial Study


Enosky, James & Susan

Initial Study


Fontana Prologis

Notice of Availability

Initial Study

Air Quality Assessment

Geotechnical Report

Drainage Report

WQMP

Traffic Study

Soil Percolation Report


Industrial Land Development

Notice of Availability

Initial Study


Islamic Community Center - Redlands  

Initial Study

Air Quality & GHG Assessment

Habitat Assessment

Hydrology Report

Noise Impact Analysis

Percolation Report - March 25, 2017

Phase I Cultural Report

Soil Infiltration Report

Soil Investigation A

Soil Investigation B

Soil Investigation C

Traffic Study

Water Quality Management Plan


Jacinto, Larry - Tentative Tract Map 19991

Notice of Availability

Initial Study

Cultural Report

Traffic Study

       

      

Joab Jerome

Notice of Availability/Notice of Intent

Initial Study


Karaki Engineers

Notice of Availability

Initial Study

Appendix A- Air Quality and Greenhouse Gas Analysis

Appendix A- Supplemental Air Quality and Greenhouse Gas Analysis

Appendix B- Biological Study

Appendix C- Geotechnical Report

Appendix D- Health Risk Assessment

Appendix E- WQMP

Appendix F- Community Plan

Appendix G- Acoustical Information Report

Appendix H- Traffic Impact Study


L.D. Bridgewater Equipment Co.

Initial Study

Engineering Geology Study

Air Quality Modeling

Air Quality Construction and Operation Tables


Las Terrazas Mixed-Use Affordable Apartments and Childcare Project

Las Terrazas FONSI-MND

Notice of Availability.Intent

Attachment A- Project Plans

Attachment B- Cultural Resources

Attachment C- Biological Resources

Attachment D- Air Quality and Greehouse Gases

Attachment E- Hazardous Materials

Attachment F- Noise

Attachment G- Traffic Impact Analysis

Attachment H- Geology and Soils

Attachment I- Hydrology.WQMP.Drainage.Sewer


Laurel Avenue General Plan Amendment & TTM 18983

Initial Study

Notice of Availability

Phase I Cultural Resources Report

General Habitat Assessment

Will Serve Letter


Lazer Broadcasting, Inc. (Oak Glen)

Initial Study

Visual Impact Assessment

Revised Notice of Availability/Notice of Intent

Environmental Impact Report

2016 Notice of Availability

Engineering Statement

Notice of Preparation

Fire Protection Analysis

SBSC Ruling

Visual Assessment Forms

Biology Reports

Geotechnical Investigation

NOP Comment Letters

Visual Resource Assessments


Ling Yen Mountain Temple

Notice of Preparation Scoping Meeting

Air Quality - GHG Assessment

Architectural Site Plan Phase I

Architectural Site Plan Phase II

Architectural Site Plan Phase III

Cultural Resources Phase I

Drainage

Fault Rupture Hazard

Habitat

Noise

Paleontologic Resource

Traffic Impact Analysis

Water Quality Management Plan


Lugonia Avenue Housing Project (Redlands)

Notice of Finding of No Significant Impact and Notice of Intent

Environmental Assessment


Lytle Creek Wash (Lytle Creek)

Notice of Decision (April 8, 2011)

Initial Study Addendum (December 13, 2010) 

Notice of Availability of an Addendum to a Mitigated Negative Declaration  (December 13, 2010) 

Notice of Intent to Adopt a Mitigated Negative Declaration (December 13, 2010)

Initial Study Addendum

Attachment A - Initial Study

Attachment B - Conditions of Approval


Opal Avenue Residential Development (TT 18952)

Initial Study

Notice of Availability


Pacific Industrial (Bloomington Truck Terminal)

Initial Study

Notice of Availability

Air Quality

Biological Resources

Greenhouse Gas

Noise

Traffic


Perricone (Manny Gonzales)

Initial Study


Prologis - Redlands

Initial Study

Appendix A - Air Quality and Climate Change Assessment

Appendix B - Phase I Environmental Site Assessment

Appendix C - Noise Study

Appendix D - Traffic Study


Redlands Commerce Center

Initial Study

Notice of Availability (Updated April 6, 2018)    


Rossmore Enterprises

Initial Study

Notice of Intent and Availability


San Antonio Heights Trail Project

Notice of Intent to Adopt a Mitigated Negative Declaration for the San Antonio Heights Trail Project (November 19, 2010) 

Initial Study

Appendix A - Air Quality Analysis

Appendix B - Habitat Assessment

Appendix C - Cultural Resources Assessment

Appendix D - Jurisdictional Delineation


Slover Avenue

Notice of Availability (February 18, 2010) for the Initial Study/Proposed Mitigated Negative Declaration for the proposed Slover Avenue Widening Project, located along a 1.5 mile stretch of Slover Avenue in the Unicorporated Avenue of Bloomington. 

Initial Study

Appendix A - Air Quality Analysis

Appendix B - Biological Resources Report

Appendix C - Cultural Resources Investigation

Appendix D - Noise Impact Analysis


St. George Church

Initial Study

Notice of Intent

Air Quality

Habitat Suitability Assessment

Phase I

Traffic Study Part 1

Traffic Study Part 2


Stonegate

Initial Study

Draft Mitigated Negative Declaration

Notice of Availability

Stonegate Biological Report


TEC Equipment, Inc.

TEC Equipment MND

Air Quality and Greenhouse Gas Analysis

Cultural Resources Study

Drainage Study

Geotechnical Report

Site Remediation

Traffic Study

Fontana Water Company 2010 Urban Water Management Plan

Water Quality Management Plan


Thirfty Oil Warehouse

Initial Study

Air Quality and GHG Report

Habitat Assessment Report

Cultural Resource Survey

Geotechnical Report Infiltration Report

Phase I Enviromental Assessment Report

Preliminary WQMP

Noise Report

Traffic Study


Treh Partners, LLC

Initial Study


Truck Terminal

Initial Study

Notice of Availability

Environmental Site Investigation

WQMP


University Crossings Planned Development

Notice of Availability/Notice of Intent

Initial Study

Air Quality Study

Hydrology Study

Preliminary Water Quality Management Plan

Traffic Study

Traffic Appendices

Cultural Study

Noise Study

Traffic Study (Revised)


Valley Corridor Specific Plan

Map of Specific Plan Area

Final EIR (added 6/18/18)      

Notice of Preparation

Notice of Preparation Scoping Meeting

Valley Corridor Specific Plan Factsheet

Notice of Availability

REVIEW DRAFT - Valley Corridor Specific Plan

Draft Environmental Impact Report

Appendix A- Notice of Preparation

Appendix B- Modeling

Appendix C- Habitat Assessment

Appendix D- Cultural Resource Report

Appendix E- Phase 0 Site Assessment

Appendix F- Noise Modeling Data

Appendix G- Traffic Analysis Part 1

Appendix G-Traffic Analysis Part 2

Appendix H- Domestic Water Availably Assessment

Appendix I- Public Service Correspondence

Appendix J- Hydrology Calculations


Werner Enterprises Facility Project

Notice of Availability/Notice of Intent

Initial Study


Western Freight Carrier, Inc.

Notice of Availability/ Notice of Intent/ Initial Study


Western Realco.

Scoping Meeting Change

Initial Study

Notice of Preparation

Draft EIR

Appendices

Appendix A- Scoping

Appendix B- Air Quality, Green house Gas and Energy

Appendix C- Cultural Resources Assessment

Appendix D- Hazardous Materials

Appendix E- Noise

Appendix F- Traffic

Appendix G- Biological Resources

Appendix H- Water Resources

Appendix I- Geology

Appendix J- Lighting Plan

Appendix K- Resumes

Final EIR Revised 3-29-17