envelope Sign up to receive email updates when new content is posted.

Valley Region

800 Opal, LLC

800 Opal, LLC

Initial Study

Traffic Impact Study

Biological Study

Burrowing Owl Survey Study

Drainage Study

Cultural Resources Study

Air Quality Impact Report

Fiscal Impact Analysis

Greenhouse Gas Report

Health Risk Analysis Report

Noise Impact Analysis

Geotechnical Report

WQMP

NOA


10336 Alder Avenue Industrial Project  

Notice of Availability

Initial Study

Mitigation Monitoring Plan

AB52 Correspondence

Air Quality and Greenhouse Gas Analysis

Health Risk Assessment

Biological Resources Assessment

Cultural/Paleontological Resources Memo

Energy Impact Analysis

Geotechnical Investigation

Percolation Report

Phase 1 Environmental Site Assessment

Preliminary Drainage Study

Preliminary WQMP

Acoustical Assessment

Trip Generation Memo


Alere Warehouse at Slover/Cactus 

Draft Environmental Impact Report

Notice of Completion and Availability

Initial Study

Air Quality Impact Analysis

Mobile Source Health Risk Assessment

Supplemental Air Quality Impact Analysis

Biological Assessment

Cultural Assessment

Energy Analysis

Geotechnical Investigation

Soil Infiltration Study

Greenhouse Gas Analysis    

Phase I Environmental Site Assessment

Preliminary Hydrology Report

Preliminary Water Quality Management Plan

Noise Impact Analysis

Traffic Impact Analysis

Traffic Impact Appendix


American Asphalt South & Sosa Pallets

Initial Study

Notice of Availability


Agua Mansa Distribution Center- Strategic Land Partners

Notice of Availability

Initial Study

Air Quality Assessment

Air Quality Assessment (Addendum)

Delineation of State and Federal Jurisdictional Waters

Drainage Report

Delhi Sands Flower-Loving Fly Habitat Suitability Assessment

Habitat Assessment

Noise Impact Study

Traffic Report

WQMP


Alabama Venture I, L.P.

Notice of Availability (November 16, 2014)

Initial Study

Air Quality, Global Climate Change, Health Risk Assessment

Noise Impact

Traffic Impact


Alere Warehouse @ Cajon Boulevard

Notice of Availability/Notice of Intent

Air Quality Impact Analysis

Biological Assessment

San Bernardino Kangaroo Rat Trapping Study

Geotechnical Report

Soil Infiltration Study

Energy Analysis

Greenhouse Gas Analysis

Historic Resources Assessment

Health Risk Assessment

Hydrology Calculations

Noise Impact Analysis

Phase I Prehistoric Resources Assessment

Phase I Environmental Site Assessment

Preliminary WQMP

Traffic Impact Analysis


Almond Avenue Warehouse 

Notice of Availability

Initial Study

Air Quality

Health Risk Assessment

Biotic Resources Report

Cultural Resources

Geotechnical Investigation

Geotechnical Investigation Infiltration Testing

Geotechnical Investigation Percolation Testing

Greenhouse Gas Emissions

Phase I ESA

Phase II Subsurface Investigation and Pre Demolition Survey

Preliminary Water Quality Management Plan

Hydrology Report

Acoustical Assessment

VMT Memo

NOD


American Asphalt and Sosa Pallets

Notice of Availability/Notice of Intent

Initial Study


ARCO AM/PM

Notice of Availability/Notice of Intent

Initial Study

A. Air Quality Study

B. Biological Assessment 

C. Cultural Report

D. Hydrology Report

E. Geotechnical Report

F. Traffic Study


Arrowhead Regional Medical Center Project (Colton)

Notice of Availability (December 3, 2008)

Initial Study


Arrow Route Policy Plan Amendment, Zone Change, and Conditional Use Permit

Notice of Availability

Initial Study

Air Quality Analysis


Auto Club Speedway Event Center Project (Fontana)

Final Subsequent Environmental Impact Report (September 2010)

Notice of Availability (September 10, 2010)


Auto Club Speedway Event Center Project (Fontana)

Draft Recirculated Subsequent Environmental Impact Report (March 2010)

Appendices A-H

Notice of Completion (March 23, 2010)

Notice of Preparation (August 22, 2008)

Initial Study


Auto Club Speedway Event Center Project (Fontana)

Notice of Completion (July, 2009) of a Draft Subsequent Environmental Impact Report for the Auto Club (Formerly California) Speedway Event Center.

Draft Subsequent Environmental Impact Report

Appendix A Initial Study

Appendix B Notice of Preparation

Appendix C Notice of Preparation Mailing Labels

Appendix D Notice of Preparation Comments

Appendix E1 Technical Noise Analysis

Appendix E2 Combined Noise Summaries

Appendix F Air Quality Study

Appendix G Response to Comments

Appendix H Figures from Original DSEIR


Avenal Financial - Tentative Tract 18822

Notice of Availability/Notice of Intent

Initial Study


B&D Contractor Storage Yard

Notice of Availability/Notice of Intent

Initial Study


Banuelos, Jose & Martha

Initial Study


Beech Sequoia - Tentative Tract Map 20001

Notice of Availability

Initial Study


Bloomington Affordable Housing Project

Notice of Availability/Notice of Intent

Initial Study/Environmental Assessment

Regional Map

Vicinity Map

Site Plan

Elevation

Paleo-Archeo Assessment

Habitat Assessment

Air Quality Data

Environmental Site Assessment Phase I

Asbestos Survey

Lead Survey

Noise Data

Traffic Impact Analysis


Bloomington Business Park Specific Plan

Notice of Preparation 

Spanish: Aviso de Preparación    

Bloomington Business Park Specific Plan CEQA Scoping Meeting Presentation   

Notice of Completion and Availability

Notice of Availability- English

Notice of Availability- Spanish

Draft Bloomington Business Park Specific Plan

NOC for EIR

Draft Environmental Impact Report

Appendix A- NOP and NOP Comments

Appendix B- LESA Model Memo and Worksheets

Appendix C1- Air Quality Report

Appendix C2- Health Risk Assessment  Report  

Appendix C3- GHG Report

Appendix C4- EA Report

Appendix C5- AQ, GHG, and EA Memo

Appendix D1- Biological Resources Assessment

Appendix D2- Habitat Assessment

Appendix E- Cultural Resources Assessment

Appendix F- Paleontological Resources Report

Appendix G1- Geological Hazards Letter

Appendix G2- Geologic Hazards Letter Addendum

Appendix G3- Site 1 Feasibility Study

Appendix G4- Site 2 Feasibility Study

Appendix G5- Sites 3 and 4 Feasibility Study

Appendix H1- Desktop Review Phase 1

Appendix H2- Site 1 Phase 1

Appendix H3- Site 2 Phase 1

Appendix H4- Site 3 Phase 1

Appendix H5- Site 4 Phase 1

Appendix H6 Limited Phase II

Appendix I1a- Site 1 WQMP

Appendix I1b - Site 1 Hydro Report

Appendix I2a- Site 2 WQMP

Appendix I2b- Site 2 Hydro Report

Appendix I3a- Site 3 WQMP

Appendix I3b- Site 3 Hydro Report

Appendix I4a- Site 4 WQMP

Appendix I4b- Site 4 Hydro Report

Appendix I5- Water Supply Assessment

Appendix J1- Noise Study

Appendix J2- Noise Upzone Memo

Appendix K1- Traffic Impact Assessment

Appendix K2- VMT Analysis

Appendix L- Service Letter Response 


Bloomington Center

Notice of Availability/Notice of Intent

Initial Study

Appendix A - Air Quality-GHG Report

Appendix B - Biological Technical Report

Appendix C - Cultural Assessment

Appendix D - Geotechnical Investigation

Appendix E - Hydrology Study

Appendix F - Noise Study

Appendix G - Traffic Study


Bloomington Business Center

Notice of Preporation

Notice of Availability

MND-Initial Study


CK Store @ Santa Ana Avenue

Notice of Availability/Notice of Intent

Initial Study     


California Steel Industries, Inc.

Notice of Availability and Notice of Intent

Initial Study


Cedar Avenue Technology Center

Notice of Availability

Mitigated Negative Declaration - MND

Air Quality

Geotechnical

Greenhouse Gas Emissions

Habitat Evaluation

Historical Archaeological Resources

Noise Study

Phase I Environmental

Preliminary Drainage Study

Traffic

Water Quality Management Plan


Cedar Avenue Truck Terminal

Notice of Availability/Notice of Intent

Initial Study

Biological Assessment

Cultural Report

Noise Study

Traffic Study


Cedar Slover Commercial Retail Project

Initial Study

Notice of Availability/Notice of Intent

Air Quality - Annual

Air Quality - Summer

Air Quality - Winter

Biological Assessment

Cultural Report Phase I

Fire Flow

Hydrology Study

Soils and BMP Report

Traffic Analysis Revised Right-In/Right-Out

Traffic Analysis

Traffic VMT Analysis

Water Quality Management Plan


Chino Airport Groundwater Remedial Project 

Initial Study 

Notice of Availability/Notice of Intent 

Biological Resources (Updated May 10, 2018)


Chino Valley Chinese SDA Church

Notice of Availability/Notice of Intent

Initial Study


Coastal Commercial Properties

Initial Study


Cornerstone Land Surveying Inc. TTM

Initial Study

Notice of Availability

Acoustical Study

Historical Resources Investigation

WQMP


Crestwood Homes

Notice of Availability

Initial Study

Vehicle Miles Traveled Memo

Conceptual Floor Plans and Elevations

General Plan Amendment Map

Air Quality Emissions Estimator- Annual

Air Quality Emissions Estimator- Summer

Air Quality Emissions Estimator- Winter

Air Quality and Greenhouse Gas Report

Noise Study

Biological Resources Assessment

Historical and Archaeological Resources Report

Preliminary Water Quality Management Plan

Preliminary Drainage Study

Soils Report

Soil Infiltration Report


CRP Oakmont Redwood Avenue, LLC

Initial Study

Notice of Availability

Traffic Impact Analysis

Noise Study

Air Quality and Climate Change Assessment

Phase I Environmental Site Assessment


DCT Industrial

Initial Study

Notice of Availability/Notice of Intent


Drive Time Car Lot Sales

Notice of Availability/Notice of Intent

Initial Study


Duke Warehouse (Updated December 19, 2019)    

Notice of Completion/Notice of Availability

Draft Environmental Impact Report

Final Environmental Impact Report       

Notice of Preparation DEIR

Project Site Plans

Tentative Parcel Map 19951

Air Quality Assessment

Biological Study

City of Redlands Will Serve Letter

Geotechnical Investigation

Greenhouse Gas Analysis

Health Risk Assessment

Infiltration Report

Paleontological Resource Assessment

Phase I Cultural Resource Assessment

Preliminary Drainage Study

Scope For Traffic Study

Traffic Impact Analysis

Water Quality Management Plan


Enosky, James & Susan

Initial Study


Fast Cargo Truck Yard

Notice of Availability

Initial Study

Appendix A- Air Quality and GHG Computer Modeling Outputs

Appendix B-Biological Resources Report.pdf

Appendix C- Phase I Cultural Resources Assessment


FedEx Parking Lot (Updated March 15, 2019)        

Notice of Availability      

Initial Study

Air Quality, Health Risk, and Greenhouse Gas Assessment Report

Biological Study

Cultural and Paleontological Resources

Geotechnical Report Update

Environmental Site Assessment

Preliminary Drainage Study

Preliminary Water Quality Management Plan

Noise Study

Existing Noise Study

Reference Noise Level Measurements

Trip Generation Analysis


First Industrial Warehouse

Notice of Availability/Notice of Intent

Initial Study

Air Quality Report

Biological Assessment Report

Cultural Resources Study

Health Risk Assessment

Greenhouse Gas Report

Geotechnical Investigation

Paleontological Assessment

Phase I Environmental Site Assessment

Preliminary Hydrology Report

Preliminary Water Quality Management Plan

Soils Infiltration Report

Traffic Analysis Report

Traffic Analysis Appendices

Vehicle Miles Traveled Analysis


Fontana Prologis

Notice of Availability

Initial Study

Air Quality Assessment

Geotechnical Report

Drainage Report

WQMP

Traffic Study

Soil Percolation Report


Industrial Land Development       

Notice of Availability

Initial Study


Islamic Community Center - Redlands  

Initial Study

Air Quality & GHG Assessment

Habitat Assessment

Hydrology Report

Noise Impact Analysis

Percolation Report - March 25, 2017

Phase I Cultural Report

Soil Infiltration Report

Soil Investigation A

Soil Investigation B

Soil Investigation C

Traffic Study

Water Quality Management Plan


Jacinto, Larry - Tentative Tract Map 19991

Notice of Availability

Initial Study

Cultural Report

Traffic Study


JM Realty Group, Inc. (Slover Distribution Center)          

Final EIR-Uploaded on 6-15-18

Notice of Availability of DEIR

Draft EIR

Appendix A Scoping Documents

Appendix B Air Quality, GHG, Energy

Appendix C Biological Resources

Appendix D Cultural Resources

Appendix E Geology

Appendix F Hazardous Materials

Appendix G Noise

Appendix H Traffic

Appendix I Water Resources

Joab Jerome

Notice of Availability/Notice of Intent

Initial Study


Karaki Engineers

Notice of Availability

Initial Study

Appendix A- Air Quality and Greenhouse Gas Analysis

Appendix A- Supplemental Air Quality and Greenhouse Gas Analysis

Appendix B- Biological Study

Appendix C- Geotechnical Report

Appendix D- Health Risk Assessment

Appendix E- WQMP

Appendix F- Community Plan

Appendix G- Acoustical Information Report

Appendix H- Traffic Impact Study


Kaiser Distribution Center #10 - Fontana

Notice of Availability/Notice of Intent

Initial Study

Appendix A - Air Quality

Appendix B - Health Risk Assessment

Appendix C - Burrowing Owl Sustainability Assessment

Appendix D - Cultural Resources Study

Appendix E - Energy Analysis

Appendix F - Geology Report

Appendix G - Paleontological Assessment

Appendix H - GHG Analysis

Appendix I - Phase I ESA

Appendix J - Preliminary WQMP

Appendix K - Hydrology Report

Technical Appendix L - Noise

Technical Appendix M - Traffic Report

Technical Appendix N - Supplemental Traffic Report

Technical Appendix O - VMT Analysis


Kendall Truck Terminal For Overflow Trailer Truck Parking

Notice of Availability

Initial Study

Air Quality and Greenhouse Gas Impact Analysis

Kangaroo Rat Survey

Trip Generation and VMT Analysis

Engineering Geology Study

Air Quality Modeling

Air Quality Construction and Operation Tables


Las Terrazas Mixed-Use Affordable Apartments and Childcare Project

Las Terrazas FONSI-MND

Notice of Availability.Intent

Attachment A- Project Plans

Attachment B- Cultural Resources

Attachment C- Biological Resources

Attachment D- Air Quality and Greehouse Gases

Attachment E- Hazardous Materials

Attachment F- Noise

Attachment G- Traffic Impact Analysis

Attachment H- Geology and Soils

Attachment I- Hydrology.WQMP.Drainage.Sewer


Laurel Avenue General Plan Amendment & TTM 18983

Initial Study

Notice of Availability

Phase I Cultural Resources Report

General Habitat Assessment

Will Serve Letter


Ling Yen Mountain Temple

Notice of Preparation Scoping Meeting

Air Quality - GHG Assessment

Architectural Site Plan Phase I

Architectural Site Plan Phase II

Architectural Site Plan Phase III

Cultural Resources Phase I

Drainage

Fault Rupture Hazard

Habitat

Noise

Paleontologic Resource

Traffic Impact Analysis

Water Quality Management Plan


Lord Construction

Notice of Availability

Initial Study

Appendix A- CalEEMod Data Sheets

Appendix B- Historical Resources Information System

Appendix C- Report of Soils and Foundation Evaluations and Soils Infiltration Testing for WQMP

Appendic D- Water Quality Mangement Plan

Appendix E- Hydrology Study

Notice of Determination


Lugonia Avenue Housing Project (Redlands)

Notice of Finding of No Significant Impact and Notice of Intent

Environmental Assessment


Lytle Creek Wash (Lytle Creek)

Notice of Decision (April 8, 2011)

Initial Study Addendum (December 13, 2010)

Notice of Availability of an Addendum to a Mitigated Negative Declaration (December 13, 2010)

Notice of Intent to Adopt a Mitigated Negative Declaration (December 13, 2010)

Initial Study Addendum

Attachment A - Initial Study

Attachment B - Conditions of Approval


Maple Hill Community Fields Complex

Notice of Availability/Notice of Intent

Initial Study

Appendix 1: Arborist Report

Appendix 2: Air Quality Report

Appendix 3: Biology

Appendix 5: Hydrology

Appendix 6: Traffic Letter

Figures


Mentone Gas Station C-store and Car Wash     

Notice of Availability

Initial Study

Air Quality Analysis

Biological Assessment

Environmental Hazards

Noise Study

Hydrology

Soils Report

Traffic Study


More Design Solutions

Notice of Availability

Initial Study

Traffic Analysis

Hydrology Study

Cultural Resources Report

Air Quality Study

Biological Report


Mountain Pass Mine 

Notice of Availability

Initial Study

Initial Study Figures


OFT Construction Equipment Yard 

Notice of Availability 

Initial Study

Cultural Report

VMT Letter

Biological Survey

Water Quality Management Plan

Hydrology Study & Drainage Analysis

Air Quality and GHG Studies


Old Dominion Freight Line, Inc. - Fontana Facility

Notice of Availability/Notice of Intent

Initial Study

Air Quality Report

Habitat Assessment

Cultural Resources Report

Hydrology Study

Trip Generation

Traffic Screening Analysis

Water Quality Management Plan

Site Plan


Opal Avenue Residential Development (TT 18952)

Initial Study

Notice of Availability


Overton- Tentative Parcel Map No. 20121

Notice of Availability

Initial Study- Mitigated Negative Declaration

Air Quality Memo

Habitat and Jurisdictional Assessment

Burrowing Owl and Nesting Bird Report

Fire Protection District and Plan

Geotechnical Report

Hydrology Report

Percolation Report

Percolation Testing for Storm Water Infiltration



Pacific Industrial (Bloomington Truck Terminal)

Initial Study

Notice of Availability

Air Quality

Biological Resources

Greenhouse Gas

Noise

Traffic


Pallet Center, Inc. (Updated February 14, 2019)

NOA

Initial Study


Perricone (Manny Gonzales)

Initial Study


Prologis - Redlands

Initial Study

Appendix A - Air Quality and Climate Change Assessment

Appendix B - Phase I Environmental Site Assessment

Appendix C - Noise Study

Appendix D - Traffic Study


Quarry Q

Notice of Availability

Draft Environmental Impact Report

Final Environmental Impact Report

Studies:

Scoping Report

Final Notice of Preparation

Reclamation Plan

Mining Reclamation Plan Conditional Use Permit Application

General Plan Amendment Application

Visual Impact Analysis

Air Quality, Health Risk, and Climate Change Impact Analysis

Habitat Assessment

Cultural Report

Geotechnical Report

Geotechnical Supplement

Geotechnical Addendum

Drainage Report

Devil Creek Diversion Channel Analysis

Water Supply Analysis

Noise Impact Analysis


Redlands Commerce Center

Initial Study

Notice of Availability (Updated April 6, 2018)


Rossmore Enterprises

Initial Study

Notice of Intent and Availability


Ross McCune- Warehouse

Notice of Availability

Initial Study

Cultural Resources Report

Air Quality Calculations


San Antonio Heights Trail Project

Notice of Intent to Adopt a Mitigated Negative Declaration for the San Antonio Heights Trail Project (November 19, 2010)

Initial Study

Appendix A - Air Quality Analysis

Appendix B - Habitat Assessment

Appendix C - Cultural Resources Assessment

Appendix D - Jurisdictional Delineation


Slover Avenue

Notice of Availability (February 18, 2010) for the Initial Study/Proposed Mitigated Negative Declaration for the proposed Slover Avenue Widening Project, located along a 1.5 mile stretch of Slover Avenue in the Unicorporated Avenue of Bloomington.

Initial Study

Appendix A - Air Quality Analysis

Appendix B - Biological Resources Report

Appendix C - Cultural Resources Investigation

Appendix D - Noise Impact Analysis


SRI SAIRAM MANDIR (Proj-2020-00056) Chino

Notice of Availability

Mitigated Negative Declaration

Temple Concept Design

Traffic Study

On-Site Sewage- Feasibility Investigation

Percolation Report

Soil Infiltration Report

Biological Resources Memorandum

Air Quality Analysis

Green House Gas Memorandum

Nosie Study Analysis

Preliminary Hydrology Report

Preliminary Water Quality Management Plan



St. George Church

Initial Study

Notice of Intent

Air Quality

Habitat Suitability Assessment

Phase I

Traffic Study Part 1

Traffic Study Part 2


Standard Apartments

Notice of Availability

Initial Study

Soils Report

Drainage Study

Noise Study

Green House Gas Analysis

Traffic Study

Habitat Assessment

Economic Report

Cultural Resources

Air Quality Analysis


Stonegate

Initial Study

Draft Mitigated Negative Declaration

Notice of Availability

Stonegate Biological Report

 


Star Point Warehouse - Proj-2021-00013

Notice of Availability 

Initial Study (ISMND)

ISMND Appendices 

General Biological Resources Assessment 

Historical- Archaeological Resources Survey 

Additional Phase I Archaeological Testing Program 

Extended Phase I Archaeological Testing Program 

Phase I ESA

Paleontological Resources Assessment Report 

Trip Generation Report 

VMT Analysis

Site Plan 


Summerland Senior Living- Chino  

Notice of Availability

Initial Study

Water Quality Management Plan

Vehicle Miles Traveled (VMT) Analysis

Geotechnical Report

Preliminary Drainage Study

Noise Impact Study

General Biological Report

Feasibility Study for Onsite Sewage Disposal System

Cultural Resource Assessment

Air Quality and Greenhouse Gas Analysis

   



TEC Equipment, Inc.     

TEC Equipment MND

Air Quality and Greenhouse Gas Analysis

Cultural Resources Study

Drainage Study

Geotechnical Report

Site Remediation

Traffic Study

Fontana Water Company 2010 Urban Water Management Plan

Water Quality Management Plan


Thirfty Oil Warehouse

Initial Study

Air Quality and GHG Report

Habitat Assessment Report

Cultural Resource Survey

Geotechnical Report Infiltration Report

Phase I Enviromental Assessment Report

Preliminary WQMP

Noise Report

Traffic Study


Topgolf Entertainment           

Initial Study

Notice of Availability

Drainage Study

WQMP

Biological Resources Assessment

Noise Impact Report

Air Quality Analysis

Greenhouse Gas Analysis

Traffic Study

Cultural Resources Report- Redacted


Transwestern Development

Notice of Availability

Initial Study


Treh Partners, LLC

Initial Study


Truck Terminal

Initial Study

Notice of Availability

Environmental Site Investigation

WQMP


University Crossings Planned Development

Notice of Availability/Notice of Intent

Initial Study

Air Quality Study

Hydrology Study

Preliminary Water Quality Management Plan

Traffic Study

Traffic Appendices

Cultural Study

Noise Study

Traffic Study (Revised)


Valley Corridor Specific Plan

Map of Specific Plan Area

Final EIR (added 6/18/18)

Notice of Preparation

Notice of Preparation Scoping Meeting

Valley Corridor Specific Plan Factsheet

Notice of Availability

REVIEW DRAFT - Valley Corridor Specific Plan

Draft Environmental Impact Report

Appendix A- Notice of Preparation

Appendix B- Modeling

Appendix C- Habitat Assessment

Appendix D- Cultural Resource Report

Appendix E- Phase 0 Site Assessment

Appendix F- Noise Modeling Data

Appendix G- Traffic Analysis Part 1

Appendix G-Traffic Analysis Part 2

Appendix H- Domestic Water Availably Assessment

Appendix I- Public Service Correspondence

Appendix J- Hydrology Calculations


Werner Enterprises Facility Project

Notice of Availability/Notice of Intent   

Initial Study


Western Freight Carrier, Inc.

Notice of Availability/ Notice of Intent/ Initial Study


Western Realco.

Scoping Meeting Change

Initial Study

Notice of Preparation

Draft EIR

Appendices

Appendix A- Scoping

Appendix B- Air Quality, Green house Gas and Energy

Appendix C- Cultural Resources Assessment

Appendix D- Hazardous Materials

Appendix E- Noise

Appendix F- Traffic

Appendix G- Biological Resources

Appendix H- Water Resources

Appendix I- Geology

Appendix J- Lighting Plan

Appendix K- Resumes

Final EIR Revised 3-29-17


Whittram Avenue Warehouse- Proj-2020-00217

Notice of Availability

Initial Study- MND

AQ, GHG, Energy Calculations 

Geotechnical Report 

Stantec Phase 1 ESA

Partner Phase 1 ESA

Partner Phase II Subsurface Investigation Report 

Noise Attachments 

Transportation Assessment 


Xtreme Pallets Project (Updated February 14, 2019)

NOA

Initial Study


Yorba Villas 

Notice of Preparation

Initial Study

Traffic Scoping Agreement 

Geotechnical Investigation 

Greenhouse Gas Energy Memo