envelope Sign up to receive email updates when new content is posted.

Moon Camp Project

Extension of Time for Recirculated DEIR II

Notice of Availability (December 9, 2011)

Recirculated DEIR II

Appendix A

Appendix B

Appendix O


Moon Camp 50 - Lot Residential Subdivision TT No. 16136 EIR (Fawnskin)

Notice of Availability (April 2, 2010)

Draft Revised and Re-circulated Environmental Impact Report (March 25, 2010)

Appendices


Moon Camp Residential Subdivision TT No. 16136 EIR (Fawnskin)

Notice of Availability (March 29, 2004)

Notice of Completion (January 27, 2006)

Draft Environmental Impact Report (March 29, 2004)

Draft Environmental Impact Report - Biological Section (March 2, 2005)

Final Environmental Impact Report (January 27, 2006)


Munem Maida

NOI Extension of Comment Period

Notice of Availability/ Intent 2014

Revised Initial Study 2014

Air Quality Impact Report 2014

Biological Report Revised 2014

Biological Letter 2014

Supplemental Preliminary Hydrology Analysis 2014

Traffic Study Updated 6-27-14

Traffic Study Updated 6-27-14- Exhibit A

Traffic Study Updated 6-27-14- Appendix

Winter Weekend Traffic Analysis 1-15-14

Response to Caltrans letter 6-23-14

Biological Report 2013

Preliminary Hydrology Drainage Study 2013

Preliminary Water Quality Management Plan Redlines 2013


Selenium Wireless Facility

Notice of Availability

Mitigated Negative Declaration

Initial Study

Photo Simulations

Selenium Cultural Report

Geotechnical Report


Skypark

Notice of Preparation

Draft EIR

APPENDIX A Notice Of Preparation and Comment Letters

APPENDIX B California Cooperative Forest Management Plan

APPENDIX C Air Quality- GHG Emissions Data

APPENDIX D.1 Habitat Assessment

APPENDIX D.2 Jurisdictional Delineation

APPENDIX D.3 NRCS Conservation Plan

APPENDIX F Engineers Septic System Memo

APPENDIX G Hydrogeologic Evaluation Technical Memo

APPENDIX H Noise Modeling Data

APPENDIX I Traffic Study