ARCHIVES
Mountain Archive (open)
Mountain Archive (Close)
AT&T Wireless
Initial Study
Big Bear Closure Cover Soil Project
Notice of Availability (February 11, 2010)
Initial Study
Burtner, William and Lisa
Initial Study
DeVincenzi
Initial Study
NOA/NOI
KADTEC - Adam Phillips
Initial Study
Mitigated Negative Declaration
Letter Recap of Acoustical Analyses
Notice of Availability/Notice of Intent
Mobilitie (Bear Valley)
Notice of Availability and Initial Study
Metro PCS Project (Lake Arrowhead)
Initial Study
Notice of Availability
Omya - White Knob - White Ridge Quarries Expansion Project
Please
CLICK HERE to access the supporting environmental documents
Notice of Preparation and Initial Study
Amended Mine and Reclamation Plan
Verizon Wireless
Notice of Availability
Initial Study
Biological Study
Cultural Assessment
Geology Report
YMCA of Long Beach
Initial Study
Notice of Availability / Notice of Intent
Arrowhead Villas Water Reservoir
Notice of Availability
Initial Study
Biology Report
Cultural Report
Drainage Study
Geotechnical Report
Burtner Day Care
Notice of Availability
Initial Study
Air Quality Report
Biotic Resources Report Update
Biological Report
Cultural Report
Cultural Report with testing
Geologic Investigation Report
Drainage Study
Water Quality Management Plan
Route 66 - Shooting Range
Notice of Availability
Initial Study
Trip Generation Report
Biotic Resources Report
Geologic Hazards Report
Notice of Availability
Pine Rose Cabins
Notice of Availability
Mitigated Negative Declaration
Traffic Study
Traffic Comments/Response
Habitat Assessment
Noise Study
Sound Suppression
Christopher Cook(High Trails Outdoor Science School)
Notice of Availability
Initial Study
Arborist Assessment June 2017
Forest Assessment
Biological Resources Assessment December 2016
Biological Resources CEQA Cumulative Analysis August 2017
Mountain Yellow Legged Frog and Southern Rubber Boa May 2017
San Bernardino Flying Squirrel May 2017
Southwestern Willow Flycatcher Habitat Assessment June 2017
Paleontological Resources Assessment
Soils Investigation
Cultural Report August 2017
Cultural Report October 2017
Cultural Resource Constraints
Church of the Woods Project (Rim Forest)
Final EIR 2020 Final EIR
2019 Documents:
Notice of Availability
Draft Revised EIR
Air Quality and GHG Analysis
Habitat Assessment
Geotechnical Update Report
Earthwork Analysis Report
Evacuation Plan
Fuel Modification Plan
Drainage Study
Noise Study
Traffic Study
Previous Documents:
Church of the Woods EIR Tables 3C-1 and 3C-2 with Legend
Extension of Time for Draft EIR (May 28, 2010)
Notice of Availability (April 16, 2010)
Draft EIR Volume I
Draft EIR Volume II
Draft EIR Volume III
Notice of Preparation (February 10, 2005)
Initial Study
Final EIR
Notice of Completion
Lazor Broadcasting, Inc.(Oak Glen)
Final Environmental Impact Report (FEIR)
Initial Study (October 26, 2011)
Visual Impact Assessment
Revised Notice of Availability/Notice of Intent
Environmental Impact Report (May 2016)
2016 Notice of Availability
Engineering Statement
Notice of Preparation
Fire Protection Analysis
SBSC Ruling
Visual Assessment Forms
Biology Reports
Geotechnical Investigation
NOP Comment Letters
Visual Resource Assessments
Mitsubishi Cement Corporation
001 Updated Notice Of Availability
002 Cover Discrimination Statement
003 Table Of Contents
004 Summary
Chapter 1 Purpose And Need
Chapter 2 Description Of Proposed Action And Alternatives
Chapter 3.10 Recreation
Chapter 3.11 Scenery
Chapter 3.1 Introduction
Chapter 3.2 Air Quality
Chapter 3.3 Biological Resources
Chapter 3.4 Cultural Heritage Resources
Chapter 3.5 Geology Soils Minerals
Chapter 3.6 Greenhouse Gases
Chapter 3.7 Hazards And Hazardous Materials
Chapter 3.8 Hydrology And Water Quality
Chapter 3.9 Noise
Chapter 4 Other Required Section
Chapter 5 Consultation-Coordination
Chapter 6 Acronyms-References
Chapter 7 Index
Appendix A-1 - Scoping Report
Appendix A-2 - Initial Study
Appendix B- Air Quality Report
Appendix C - Ba-Be And Raptor Conservation Strategy
Appendix D - Jurisdictional Delineation Report
Appendix E Cushenbury Springs Hydrogeologic Evaluation
Appendix F - Geology-Soils-Hydro-Wq
Appendix G - Hazardous Materials Technical Report
Appendix H - Water Supply Assessment
Appendix I - Noise Report
Appendix J - Recreation Analysis
Appendix K - Scenery Report
Moon Camp 2018
Final EIR
Appendices:
Title Page
Table of Contents
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Appendix H
Appendix I
Appendix J
Appendix K
Appendix L
Appendix M
Previous Documents:
Extension of Time for Recirculated DEIR II
Notice of Availability (December 9, 2011)
Recirculated DEIR II
Appendix A
Appendix B
Appendix O
Moon Camp 50 - Lot Residential Subdivision TT No. 16136 EIR (Fawnskin)
Notice of Availability (April 2, 2010)
Draft Revised and Re-circulated Environmental Impact Report (March 25, 2010)
Appendices
Moon Camp Residential Subdivision TT No. 16136 EIR (Fawnskin)
Notice of Availability (March 29, 2004)
Notice of Completion (January 27, 2006)
Draft Environmental Impact Report (March 29, 2004)
Draft Environmental Impact Report - Biological Section (March 2, 2005)
Final Environmental Impact Report (January 27, 2006)
Munem Maida
NOI Extension of Comment Period
Notice of Availability/ Intent 2014
Revised Initial Study 2014
Air Quality Impact Report 2014
Biological Report Revised 2014
Biological Letter 2014
Supplemental Preliminary Hydrology Analysis 2014
Traffic Study Updated 6-27-14
Traffic Study Updated 6-27-14- Exhibit A
Traffic Study Updated 6-27-14- Appendix
Winter Weekend Traffic Analysis 1-15-14
Response to Caltrans letter 6-23-14
Biological Report 2013
Preliminary Hydrology Drainage Study 2013
Preliminary Water Quality Management Plan Redlines 2013
Selenium Wireless Facility
Notice of Availability
Mitigated Negative Declaration
Initial Study
Photo Simulations
Selenium Cultural Report
Geotechnical Report
Skypark
Sky Park Revised Final EIR
Sky Park Revised Final EIR Appendices
Final EIR
Draft EIR
Notice of Preparation
APPENDIX A Notice Of Preparation and Comment Letters
APPENDIX B California Cooperative Forest Management Plan
APPENDIX C Air Quality- GHG Emissions Data
APPENDIX D.1 Habitat Assessment
APPENDIX D.2 Jurisdictional Delineation
APPENDIX D.3 NRCS Conservation Plan
APPENDIX F Engineers Septic System Memo
APPENDIX G Hydrogeologic Evaluation Technical Memo
APPENDIX H Noise Modeling Data
APPENDIX I Traffic Study