envelope Sign up to receive email updates when new content is posted.

Mountain Region

Church of the Woods Project (Rim Forest)

Church of the Woods EIR Tables 3C-1 and 3C-2 with Legend

Extension of Time for Draft EIR (May 28, 2010)

Notice of Availability (April 16, 2010)

Draft EIR Volume I

Draft EIR Volume II

Draft EIR Volume III

Notice of Preparation (February 10, 2005)

Initial Study

Final EIR

Notice of Completion


Lazer Broadcasting, Inc. (Oak Glen)

If you wish to view the following documents, please click on the following:

Initial Study (October 26, 2011)

Visual Impact Assessment

Revised Notice of Availability/Notice of Intent

Environmental Impact Report (May 2016)

2016 Notice of Availability

Engineering Statement

Notice of Preparation

Fire Protection Analysis

SBSC Ruling

Visual Assessment Forms

Biology Reports

Geotechnical Investigation

NOP Comment Letters

Visual Resource Assessments


Mitsubishi Cement Corporation

001 Notice Of Availability

002 Cover Discrimination Statement

003 Table Of Contents

004 Summary

Chapter 1 Purpose And Need

Chapter 2 Description Of Proposed Action And Alternatives

Chapter 3.10 Recreation

Chapter 3.11 Scenery

Chapter 3.1 Introduction

Chapter 3.2 Air Quality

Chapter 3.3 Biological Resources

Chapter 3.4 Cultural Heritage Resources

Chapter 3.5 Geology Soils Minerals

Chapter 3.6 Greenhouse Gases

Chapter 3.7 Hazards And Hazardous Materials

Chapter 3.8 Hydrology And Water Quality

Chapter 3.9 Noise

Chapter 4 Other Required Section

Chapter 5 Consultation-Coordination

Chapter 6 Acronyms-References

Chapter 7 Index

Appendix A-1 - Scoping Report

Appendix A-2 - Initial Study

Appendix B- Air Quality Report

Appendix C - Ba-Be And Raptor Conservation Strategy

Appendix D - Jurisdictional Delineation Report

Appendix E Cushenbury Springs Hydrogeologic Evaluation

Appendix F - Geology-Soils-Hydro-Wq

Appendix G - Hazardous Materials Technical Report

Appendix H - Water Supply Assessment

Appendix I - Noise Report

Appendix J - Recreation Analysis

Appendix K - Scenery Report

Moon Camp Project

Extension of Time for Recirculated DEIR II

Notice of Availability (December 9, 2011)

Recirculated DEIR II

Appendix A

Appendix B

Appendix O


Moon Camp 50 - Lot Residential Subdivision TT No. 16136 EIR (Fawnskin)

Notice of Availability (April 2, 2010)

Draft Revised and Re-circulated Environmental Impact Report (March 25, 2010)

Appendices


Moon Camp Residential Subdivision TT No. 16136 EIR (Fawnskin)

Notice of Availability (March 29, 2004)

Notice of Completion (January 27, 2006)

Draft Environmental Impact Report (March 29, 2004)

Draft Environmental Impact Report - Biological Section (March 2, 2005)

Final Environmental Impact Report (January 27, 2006)


Munem Maida

NOI Extension of Comment Period

Notice of Availability/ Intent 2014

Revised Initial Study 2014

Air Quality Impact Report 2014

Biological Report Revised 2014

Biological Letter 2014

Supplemental Preliminary Hydrology Analysis 2014

Traffic Study Updated 6-27-14

Traffic Study Updated 6-27-14- Exhibit A

Traffic Study Updated 6-27-14- Appendix

Winter Weekend Traffic Analysis 1-15-14

Response to Caltrans letter 6-23-14

Biological Report 2013

Preliminary Hydrology Drainage Study 2013

Preliminary Water Quality Management Plan Redlines 2013


Selenium Wireless Facility

Notice of Availability

Mitigated Negative Declaration

Initial Study

Photo Simulations

Selenium Cultural Report

Geotechnical Report


Skypark

Notice of Preparation

Draft EIR

APPENDIX A Notice Of Preparation and Comment Letters

APPENDIX B California Cooperative Forest Management Plan

APPENDIX C Air Quality- GHG Emissions Data

APPENDIX D.1 Habitat Assessment

APPENDIX D.2 Jurisdictional Delineation

APPENDIX D.3 NRCS Conservation Plan

APPENDIX F Engineers Septic System Memo

APPENDIX G Hydrogeologic Evaluation Technical Memo

APPENDIX H Noise Modeling Data

APPENDIX I Traffic Study