envelope Sign up to receive email updates when new content is posted.

Desert Region

Aadland, Doug TPM 19621

Negative Declaration

Notice of Availability/Notice of Intent

Initial Study

Drainage Study

General Biological Assessment

TPM 19621 Archaeo Report


Airstream Motel/Campground

Initial Study

Notice of Availability

Focused Desert Tortoise Survey

Focused Desert Tortoise Study Update 7/24/2014


Ahumada, Abraham TPM 18003

Notice of Availability and Intent

Initial Study

Desert Tortoise Study

Mohave Ground Squirrel Study


Alamo Solar

Notice of Availability and Intent

Initial Study

Biological Resources Assessment

Criteria Pollutant Emissions

Draft Water Quality Management Plan

Greenhouse Gas Emissions

Hydrology Report

Hydrology Report Addendum

Paleontological Resources Assessment

Phase I Environmental Site Assessment


Altamira/YV 105

Notice of Availability

Initial Study

Air Quality Impact Analysis

Baseline Biological and Focused Desert Tortoise Survey

Biological Report Update 03.12.10

Biological Report Update 12.05.13

Cultural Resources Survey

Drainage Study Addendum

Greenhouse Gas Screening Tables

Noise Analysis

Traffic Study Part 1

Traffic Study Part 2

Updated Traffic Letter 12-5-13


Amboy Limestone Quarry

Initial Study

Notice of Availability/Notice of Intent

Amended Reclamation Plan


Apple Valley Mine

Notice of Availability

Notice of Completion

Initial Study

Mitigated Negative Declaration

Notice of Determination

Decision Notice


Becks Mine and Reclamation Plan

Notice of Availability and Notice of Intent

Initial Study


Bowman Solar

Appendix A - Bowman Solar Photo Simulations

Appendix B - Bowman Solar - Plant Inspection

Appendix B - Bowman Solar - Rare Plant Survey

Appendix B - Bowman Solar - Biological Resource Assessment

Appendix B - Bowman Solar - Burrowing Owl Survey

Appendix B - Bowman Solar - Desert Tortoise Survey

Appendix C - Bowman Solar - Cultural Resources Assessment

Appendix D - Bowman Solar - Geologic Investigation Report

Appendix E - Bowman Solar - Drainage Report

Appendix F - Bowman Solar Traffic Trip Analysis

Initial Study - Signed

NOA-NOI


Brubaker Mann Inc.

Notice of Availability and Notice of Intent

Initial Study

Mitigated Negative Declaration

Reclamation Plan Revision (April 2014)

Baseline Vegetation Analysis

Revegetation Plan & Guidelines

Focused Survey (May 2012)

Focused Survey Update (February 2014)


CAL SP VII (Lucerne Valley)

Notice of Availability and Notice of Intent

Initial Study


Cho, Duha 

Tentative Parcel Map 19284  

Notice of Availability and Notice of Intent

Negative Declaration

Initial Study


Cho, Duha

Tentative Parcel Map 1925

If you wish to view  Notice of Availability, Notice of Intent, Negative Declaration, and Initial Study, click here


Christian Evangelistic Association, Inc.

Notice of Availability and Notice of Intent

Initial Study


Clean Focus Apple Valley East

Notice of Availability and Intent

Initial Study

Air Quality Impact Analysis

Paleo Letter

Cultural Resource Assessment

Focused Desert Tortoise & Burrowing Owl

Mojave Ground Squirrel

Biological Habitat Assessment

Traffic Letter


Demers, Dennis and Montour, Robert 

Tentative Parcel Map 19256

Notice of Availability and Notice of Intent

Initial Study


Dollar General Pinon Hills

Initial Study

Notice of Availability and Intent

Acoustic Letter Report

Desert Tortoise Survey

Traffic Study

Geotechnical Investigation

Drainage Report


Dukomo Development

Notice of Availability and Intent

Initial Study

Focused Desert Tortoise Survey

Mohave Ground Squirrel Survey

Traffic Study


Dynamic Development Company, LLC (Flamingo Heights)

Initial Study

Appendix Biological

Appendix Drainage

Appendix Traffic

Notice of Availability and Notice of Intent


Dynamic Development Company, LLC (Lucerne Valley)

Initial Study

Appendix Biological

Appendix Drainage

Appendix Traffic

Notice of Availability and Notice of Intent


Foglia, Vince

Tentative Parcel Map 18540

Notice of Availability and Notice of Intent

Initial Study  


Fort Irwin Revision

MND-Notice of Availability

Focused Desert Tortoise Survey

Mining Reclamation Plan

Habitat Assessment (Burrowing Owl)


Fragroso TPM 19366

Notice of Availability and Intent

Initial Study


Gonzales, Fidel TPM 19442

Notice of Availability

Initial Study


Hacienda at Fairview Valley Specific Plan

Notice of Availability

Specific Plan

Draft EIR

Appendix A - Notice of Preparation, Public Comment Letters, and Initial Study

Appendix B - Air Quality Analysis

Appendix C - Focused Biological Survey and Jurisdictional Delineation

Appendix D - Focused Biological Survey and Jurisdictional Delineation for Offsite Improvements

Appendix E - Joshua Tree Survey Report and Management Plan

Appendix F - Geotechnical Investigation

Appendix G - Phase I Environmental Site Assessment - Fairview Creek and Granite Valley

Appendix H - Drainage Study

Appendix I - Noise Analysis

Appendix J - Public Services and Utilities Letters

Appendix K - Water Supply Assessment and Water Resources Study

Appendix L - Traffic Impact Analysis

Final EIR

Appendix A - Air Quality and Greenhouse Gas Impact Analysis Update and Peer Review

Appendix B - Biological Circumstances 2013 and Peer Review

Appendix C - Confirmation of Adequacy of Technical Studies - Hydrology, Drainage, and Water Quality

Appendix D - Geotechnical Update

Appendix E - Noise Impact Analysis Review

Appendix F - Traffic Analysis Adequacy Review and Peer Review

Appendix G - Status and Validity of Water Supply Assessment and Water Supply Verification

Appendix H - Water Supply Assessment and Water Supply Verification

Appendix I - Supplemental Traffic and Air Quality Analysis-2011


Hadley TPM 19388

Notice of Availability and Intent

Initial Study


Hi-Grade Materials - Lucerne Valley Pit

Notice of Availability

Initial Study

Jurisdictional Waters Delineation

http://www.sbcounty.gov/uploads/lus/environmental/DecisionRecordDOIBLMCAD08020150023.pdf


Highway 127 Baker to NTC

Draft Environmental Assessment/Initial Study/Mitigated Negative Declaration

Appendices A-F

Appendices G-M

Notice of Availability

FONSI DOI-BLM-CA-D080-2015-0023

Decision Record DOI-BLM-CA-D080-2015-0023

Notice of Determination

Final Mitigated Negative Declaration


Iron Age Mine

Initial Study

Biological Report

Revegetation Plan

Tortoise Survey Report

Mitigated Negative Declaration


James Darr Fill Site Project (Kramer Junction)

Notice of Availability (July 28, 2011).

If you wish to review the Initial Study, click here.  


Joshua Tree Retail Store

Notice of Availability

Notice of Preparation (Signed)

Notice of Preparation Comment Letters

Draft Environmental Impact Report

Judgment Granting Peremptory Writ of Mandate

Ruling on Petition for Writ of Mandate

Urban Decay Study

Initial Study

Appendix A Air Quality and Greenhouse Gas Emissions CalEEMod Output Sheets

Appendix B Biologist Letter Part 1 and Part 2

Appendix C Burrowing Owl Habitat

Appendix D Archaeological Information Center-Historical Resources Review

Appendix E Native American Heritage Commission Sacred Lands File Search

Appendix F Geotechnical Report

Appendix G Geotechnical Grading Plan Review

Appendix H Preliminary Water Quality Management Plan

Appendix I Phase I Environmental Assessment

Appendix J Traffic Generation Analysis

Appendix K Joshua Basin Water District Form W1 Public Water Certification


Joshua Tree Solar Farm

Notice of Availability and Notice of Intent

Initial Study

Air Quality and GHG Report

Burrowing Owl Report

General Biological and Desert Tortoise Report

Prelim Hydrology January 2015

Hydrology Report

Hydrology Addendum

Jurisdictional Delineation

Phase ! ESA

Site Plan

Site Photos

Site Photos Key

Trip Generation Analysis

Visual Analysis

WQMP

General Biological and Desert Tortoise Report 2015 Update


Kim, Sarah

NOA to OPR

NOA-NOI

Initial Study


Lewis Operating Corporation, Deep Creek Project (Apple Valley)

If you wish to view the Final EIR and Errata,  click here (July 2011).


Lewis Operating Corporation, Deep Creek Project (Apple Valley)

If you wish to review the Draft Environmental Impact Report, click here

Appendix A - Notice of Preparation and Public Comment Letters

Appendix B - Mitigated Negative Declaration and Initial Study

Appendix C - Traffic Impact Analysis and Traffic Impact Analysis Appendices A thru N

Appendix D - Botanical and Habitat Survey and Focused Biological Survey

Appendix E - Additional Biological Resources Reports


Lewis Operating Corporation, Deep Creek Project (Apple Valley)

Notice of Preparation (January 29, 2009) of environmental impact report for the Lewis Operating Corporation, LHC Alligator, LLC, Deep Creek (Apple Valley) Project.

If you wish to review the Revised and Recirculated Notice of Preparation for the Deep Creek EIR, click here.


Lewis Operating Corporation, Deep Creek Project (Apple Valley)

Notice of Availability (December 8, 2010) of the revised and recirculated section 4.2, biological resources for the Lewis Operating Corporation Deep Creek (Apple Valley) Project.

If you wish to review the Section 4.2 (Revised and Recirculated) Biological Resources, click here.


Lewis Operating Corporation, Deep Creek Project (Apple Valley)

Notice of Preparation (July 27, 2007)


Lilac & Wellsprings Development

Notice of Availability and Intent

Initial Study

Focused Desert Tortoise Survey

Mohave Ground Squirrel Survey

Traffic Study


Longboat Solar

Notice of Intent

Mitigated Negative Declaration Form

Initial Study

Appendices

Appendix A Longboat Solar Draft

Appendix B1 Longboat AQ-GHG Assessment

Appendix B2 Longboat HRA Report

Appendix C LongboatBRTR FINAL

Appendix D2 Final Cultural Resources Supplement

Appendix D3 AB52 Notification

Appendix E Longboat geotechnical report

Appendix F1 Final Phase I ESA-Longboat Solar

Appendix F2 Phase II ESA

Appendix G Hydrology Report

Appendix H Longboat Acoustical Report

Appendix I Longboat Transportation and Traffic Assessment April 2015

Lucerne Valley Desert View Ranch

Notice of Availability and Notice of Intent  (revised 11/19/2013)

Initial Study

Air Quality Analysis

Archaeologic al Records Search

Burrowing Owl Survey

Desert Tortoise Survey

Mohave Ground Squirrel Survey 

Environmental Site Assessment Phase I 

Drainage Report

Trip Generation Report

Preliminary Water Quality Management Plan


Lucerne Valley Solar One

Initial Study

Notice of Preparation of Draft EIR and Scoping meeting


Lynx Cat Mountain Quarry

Notice of Availability and Notice of Intent

Initial Study

Mitigated Negative Declaration

Air Quality Assessment

Desert Tortoise Assessment

Revegetation Plan

Focused Survey

Traffic Assessment


Madole and Associates - Tentative Tract 18736

Notice of Availability and Notice of Intent

Initial Study


Maroney TPM 18883

Notice of Availability

Initial Study


McGlade TPM 19561

Notice of Availability/Notice of Intent

Initial Study  


Mesquite Lake

Notice of Availability

Initial Study


Nursery Products LLC (Hinkley)

If you wish to view the Water Supply Assessment Addendum II (August 11, 2011), click here

Appendix A, Water Supply Assessment

Appendix B, Water Supply Assessment Addendum

Appendix C, 2010 Urban Water Management Plan

Appendix D, Judgment After Trial

Appendix E, Minute Order from Court

Appendix F, Supplemental Preemptory Writ

Appendix G, Reporter Transcript


Nursery Products LLC (Hinkley)

Notice of Availability for the Draft Supplemental Environmental Impact Report for Nursery Products Hawes Composting Facility July, 2009)

To view the Court Decision of April 11, 2008,  click here

To view the Draft Supplemental Environmental Impact Report, click here.

Appendix A, Response to Comments

Appendix B, Global Climate Change Analyses

Appendix C, Water Supply Assessment

Appendix D, Economic Feasibility

Notice of Hearing (November 16, 2009)

To view the Final Supplemental Environmental Impact Report, click here.

To view the Water Supply Assessment Addendum, click here.


Nursery Products LLC (Hinkley)

Notice of Preparation (March 10, 2009)


Nursery Products LLC (Hinkley)

Nursery Products Approval (April 10, 2007)

Notice of Completion (November 21, 2006))

If you wish to review the Final EIR, click on one of the following links. 

Cover Page

Table of Contents

Section 1 Summary of the FEIR

Section 2 List of Commentors

Section 3A Agency Comments

Section 3B Organizations

Section 4 Changes to the DEIR

Section 5 MMCP

Comments


Nursery Products LLC (Hinkley)

Notice of Preparation (June 6, 2006))

If you wish to review the Initial Study, click here

If you wish to review the Vicinity Map click here.

If you wish to review the Project Location Map, click here.

Notice of Availability (September 26, 2006)

Notice of Extension (October 19, 2006)

If you wish to review the Draft EIR, click here.

To view the Appendices, click on the appropriate appendix listed below. 

Appendix A Initial Study

Appendix B Air Quality

Appendix C Biological Resources

Appendix D Traffic Report


Oak Hills Plaza

Notice of Availability/Notice of Intent

Initial Study

Biological Resources Study

Drainage Study

Effluent Disposal Testing

Preliminary Geotechnical Report

Traffic Impact Study (10/1/2012)

Traffic Impact Study - Final

Water Service Feasibility Study

Water Quality Management Plan

Water Quality Management Plan Figure D-1


Omya California, Inc.

Notice of Availability and Notice of Intent

Initial Study

Desert Tortoise Presence/Absence Survey


Omya - Sentinel and Butterfield Quarries Expansion Project

Joint Notice of Preparation and Notice of Intent

Notice of Preparation Extension

Initial Study

Amended Plan of Operations and Reclamation Plan

Appendix 1A Decision Notice and Finding

Appendix 1B Approved Reclamation Plan

Appendix 2 Sentinel Quarry Expansion EA

Appendix 3A AQ Permits Sentinel Quarry

Appendix 3B Patterns of Carbonate Dust Deposition

Appendix 4A Groundwater Extraction and Well Permits

Appendix 4B Hydrology Report Proof of Groundwater Extraction

Appendix 5 Approved Revegetation Plan

Appendix 6A Informal Section 7 Consultation and Concurrence Sept 2000

Appendix 6B Biological Assessment May 2000

Appendix 6C1 Biological Survey 1997

Appendix 6C2 Biological Survey and Additional Correspondence

Appendix 6D Biological Survey Butterfield 3 Expansion Area Aug 2009

Appendix 6E Spotted Owl Updates

Appendix 7 Geology - Omya 1994

Appendix 8 Slope Stability Report CHJ 2012

Appendix 9A Archeological and Cultural Resource Surveys

Appendix 9B Cultural Resources Inventory 1984

Appendix 10 Approved Storm Water Monitoring Program - Cover and Approval Only

Appendix 11A Carbonate Plant Mitigation Proposal Feb 2012

Appendix 11B Details of the Rattler Mining Claims Relinquishment

Appendix 12 Omya Reclamation Report J&J 2011

Appendix 13 Spill Prevention and Control Plan


Phelan Dollar General

Initial Study

Notice of Availability

Mitigated Negative Declaration

Acoustical Study

Biological Resources

Traffic Study

Cultural Resources Assessment


Pioneer Town General Plan Amendment

Notice of Availability/Notice of Intent

Initial Study


Ramallo, Luis

Initial Study

Notice of Availability and Notice of Intent


Soda Mountain Solar

Notice of Availability

BLM Project Site


Stateline Solar Farm Project (Ivanpah)

Notice of Availablity for the Final EIR/EIS

BLM Project Site


Sully-Miller Contracting Company (Essex Pit Mine and Reclamation Plan)

Notice of Availability/Notice of Intent and Initial Study


SunEdison - Duncan Road Solar Project

Notice of Availability/Intent

Initial Study

Air Quality/Green House Gas

Construction Traffic Management

Biological Survey

Burrowing Owl Survey

Cultural Report

Hydrology Study

Jurisdictional Delineation

Mohave Ground Squirrel Habitat Assessment


SunEdison - Pinon Hills Solar Project

Notice of Availability/Intent

Initial Study

Air Quality/Green House Gas

Construction Traffic Management

Biological Survey

Burrowing Owl Survey

Cultural Report

Hydrology Study

Jurisdictional Delineation

Mohave Ground Squirrel Habitat Assessment


SunEdison- Victorville Landfill Solar

Air Quality and GHG Impact Analyses

Focused Desert Tortoise and Burrowing Owl Presence/Absent Survey

Mohave Ground Squirrel

Jurisdictional Delineation

Cultural Resource Records  

Paleontology Literature

Construction Management Plan and Trip Generation Analysis

Phase I Environmental Site Assessment

EIR

Initial Study/Addendum


SunEdison - White Road Solar Project

Notice of Availability/Intent

Initial Study

Air Quality/Green House Gas

Construction Traffic Management

Biological Survey

Burrowing Owl Survey

Cultural Report

Hydrology Study

Mohave Ground Squirrel Habitat Assessment


Sunlight Partners (Landpro) in Helendale

Notice of Availability/Intent

Initial Study

Biological Survey

Burrowing Owl Survey

Cultural Report

Hydrology Study

Mohave Ground Squirrel Habitat Assessment

Mojave Monkey Flower Habitat Assessment

Soils Report


Sycamore Physicians Partners in Oak Hills/Hesperia

Initial Study

Air Quality

Biological

Cultural

Hydrology

Notice of Availability and Intent

Preliminary Water Quality Plan

Solis Engineering Report


Tentative Parcel Map 19401 - Suh

Notice of Availability/Intent

Initial Study

Biological Surveys

Drainage Study


Tentative Parcel Map 19015-Morehart

Notice of Availability/Intent

Initial Study


Tentative Parcel Map 19586 - Rashidian

Notice of Availability

Initial Study

Biological Surveys


Thomas Stickley (Silver Valley Towing)

Initial Study


Vandenburg Construction, Inc. - TPM 18211

Initial Study - TPM 18211 Vandenburg Construction Inc

Notice of Availability

General Biological Survey

Focused Desert Tortoise Survey

Preliminary Drainage Study


Verizon Wireless-Oxford Project (Phelan)

If you wish to review the Notice of Availability and Initial Study, click here.

If you wish to review the Draft Mitigated Negative Declaration, click here.


Verizon Wireless-Realcom Associates

Initial Study

Notice of Intent and Availability


Webber-Pyley Inc.

Initial Study

Biological Report

Hydrology Study

    Hydrology Map

        Exhibit D.1

        Exhibit D.2

        Exhibit E.1

        Map E.1

        Exhibit E.2

        Map E.2

        Attachment 1

Revegetation Plan

Mitigated Negative Declaration


White Knob/White Ridge Limestone Quarries Expansion (Omya Inc.)

Notice of Completion

Final Environmental Impact Report


Wiedefeld TPM19477

Initial Study

Notice of Intent


Yerman, Donna TPM 18768

Initial Study

Notice of Intent

Preliminary Drainage Study

Tortoise Survey


Yermo Travel Stop

Initial Study

Notice of Intent

Air-Final

Phase1 rpt

Noise

Traffic Study